Interested in our Results?
EXPLORE THE STRENGTH OF SEVAN
Read our case studies. Discover our impact.
7-Eleven
7-Eleven needed to remodel 25 convenience stores to incorporate food equipment into the design of those sites.
Read more7-Eleven
7-Eleven board members chose 5 sites in San Diego to go through a remodel program to convert them into flagship stores.
Read more7-Eleven
21-Site rebrand program 100% of sites completed on time 30% Increase in sales CHALLENGE 7-Eleven acquired several convenience sites and needed to do a rebrand and minor refresh to update each location to fit their branding. They had 2-3 months to order equipment and reconcile inventory, and each site needed to be completed in […]
Read more7-Eleven
250+ Tank replacements and upgrades Developed a program plan to efficiently complete each project CHALLENGE Every year, 7-Eleven budgets for tank replacements, fuel equipment and compliance upgrades for select fueling stations across the country. To complete each project, they need help managing the replacements and upgrades, working with multiple authorities having jurisdiction (AHJs) across […]
Read moreAlbertsons
Albertsons needed to implement a strategic ADA remediation program in which 2,000+ stores were evaluated and updated.
Read moreBP
BP policy states that every five years, sites must go through a structural inspection. The site inspections generally consist of survey work for the canopies that cover the fuel stations.
Read moreBRR
BRR Architecture was contracted by a major retailer to remodel and build a warehouse facility in California. They needed help with the zoning and permitting process.
Read moreCarbon Health
240 Site assessments and Revit models.2-3 Week deliverable timeline. Challenge Carbon Health wanted to to expand their new build clinics and assess mergers and acquisitions across the country. They needed help assessing property and organizing data in a timely manner to allow their real estate team to decide on what sites they would move forward […]
Read moreChase Bank
Chase Bank needed to update 260 sites across the country. Each site needed to follow ADA guidelines and go through a redesign that matched its own innovation upgrade initiatives.
Read moreChipotle
Chipotle noticed an increase in online order demand in 2018 and needed to renovate their restaurants to accommodate these orders. Chipotle found that the best way to upgrade their facilities to accept the online order was to create Digital Make Lines (DMLs) in the kitchen
Read moreCKE Restaurants
CKE (Carl’s Jr.) leveraged Sevan’s design expertise for new restaurant to meet the challenges of the Los Angeles Green Building Code (LAGBC) to reduce the building’s energy and water use, reduce waste, and reduce the carbon footprint.
Read moreCollaborative PM
Optimized payment processes. Reduced time spent managing invoices. CHALLENGE An energy client was encountering challenges due to its heavy reliance on Google Sheets. This led to duplicated data entry, overlapping workflows, unreliable information and miscommunication in operations and financial tracking. SOLUTION After partnering with Sevan to implement a new collaborative project management software solution, the […]
Read moreEmergency Housing
A housing client with multiple damaged homes during a hurricane required immediate survey and assessment of damages.
Read moreGiant Eagle
Giant Eagle needed help to execute its new Prepared Foods Reduction Program, consisting of 64 stores across Pennsylvania, Ohio, West Virginia and Indiana.
Read moreH-E-B
H-E-B wanted to build a strategy around remodeling and optimizing 43 stores in its network.
Read moreHarvest Energy
7-Week expedited program.Shop remained open with minimal disruption. CHALLENGE The existing site was an operational BP petrol filling station with a single-story flat roof building and three fuel dispensers. Since it was a busy service station, there was limited space for redevelopment work, and the shop and forecourt had to remain open. SOLUTION Wyeth designed and […]
Read moreHarvest Energy
Full site rebuild after extensive fires. CHALLENGE An extensive fire rendered the service station beyond repair, requiring the complete demolition of the current buildings, forecourt pump arrangement and ancillary facilities. The site was within a sensitive conservation area, so it needed a sympathetic rebuild to retain its architectural heritage. It was a small restricted site layout […]
Read moreHCA
HCA wanted to expand its Free-Standing Emergency Room (FSER) program and needed a partner who understood the healthcare industry. HCA chose Sevan to act as their owner’s representative to handle all FSER site builds across the country.
Read moreHousing Renovations
A rental portfolio owner has numerous homes in need of varying levels of exterior, interior and infrastructure repairs.
Read moreIKEA
In an effort to align with its international facilities, IKEA set out to upgrade all restroom facilities in its U.S. stores and offices to gender-neutral spaces.
Read moreImmunotek
ImmunoTek operated 13 plasma donation centers across the United States. They needed a partner who could assess conditions and collect information from each potential new site.
Read moreImproved Org Platform
Enhanced reporting and accountability. Optimized company-wide operations. CHALLENGE A design and construction firm had numerous departments operating in isolation, hindering essential collaboration. The absence of a single source of truth further heightened the issues, resulted in inefficiencies and caused scalability issues. SOLUTION Leveraging Sevan’s Technology & Data Analytics Team, the client established an intuitive and […]
Read moreJCPenney
JCPenney identified 100 stores needing interior and exterior remodels based on capital, profitability and store conditions.
Read moreJCPenney
JCPenney is converting Sephora branded retail spaces within their department stores into a JCPenney branded cosmetics retail space.
Read moreJiffy Lube
In 2020, Jiffy Lube set out to expand its store presence for the first time in 22 years. In total, 60 new sites will be built over the course of 2-3 years. Resource and labor scarcity has led to inflated bid costs, making it more expensive for Jiffy Lube to build its sites.
Read moreKroger
Sevan provided civil engineering, zoning and permitting services for the design and entitlements for new retail petroleum sites at existing Kroger grocery stores and stand-alone sites.
Read moreLuxottica
Luxottica started remodeling North American stores for various brands including LensCrafters, Sunglass Hut, Ray Ban, Oakley, Oliver Peoples, Target Optical and Pearle Vision.
Read moreMake Rent Ready
A rental portfolio owner was struggling to get their homes rent ready quickly enough to maximize income potential.
Read moreMcDonald’s
McDonald’s selected Sevan to project manage renovations of numerous Chicago-area spaces – including the iconic landmark Rock-N-Roll McDonald’s at 600 N. Clark Street.
Read moreMcDonald’s
650 sites in least modernized market; largest remodel program in McDonald’s history.
Read moreMcDonald’s
McDonald’s needed to relocate an existing site on Camp Pendleton Marine Base in Oceanside, CA.
Read moreMFG EV Stations
4 EV station remodels 2 Standalone EV stations 10-12 Week installation timeline CHALLENGE Motor Fuel Group (MFG) operates over 900 sites across the U.K. Electric vehicles are becoming increasingly popular and as a result, MFG is adding EV chargers to some of their sites. Adding EV charging requires updates to their power grid. Supplying […]
Read moreMilitary Housing
A military housing client needs to repair 18 buildings at their site, and each building is three stories and has 24 units.
Read moreMotor Fuel Group
New build development with added revenue opportunities.Improved station performance. CHALLENGE Motor Fuel Group (MFG) needed a new build development for a new store, EV charging, forecourt, pumps and valet. The site was small, which made it difficult at times to make progress. A few design alterations were needed throughout the build, primarily with the heavy […]
Read moreMotor Fuel Group
8 EV charging stations installed.New-to-industry site with Food-To-Go offering. CHALLENGE The site was a greenfield site comprised of a large plot of open land previously used in conjunction with Filton Airfield. SOLUTION Wyeth, a Sevan company, worked alongside a proactive main contractor to deliver the product successfully. The access road into the site included a […]
Read moreMotor Fuel Group
First Burger King built in existing space.5-Week program rollout. CHALLENGE Motor Fuel Group (MFG) wanted to incorporate a Burger King into its existing building. The space needed foundation work, fitting out a mezzanine floor for the plant and fitting out the Burger King and preparation areas. SOLUTION Since it was a small area to work […]
Read moreMotor Fuel Group
5 EV charging bays installed.Station remained open with minimal disruption. CHALLENGE Before work began, the Motor Fuel Group (MFG) site contained a single-story sales building and forecourt equipped with six pump islands with below ground fills and vents. There were also six customer parking spaces and car care facilities. There was pressure to keep the […]
Read moreMotor Fuel Group
Increased site proposition.Innovative problem-solving for on-time opening. CHALLENGE The Motor Fuel Group (MFG) greenfield site was created as part of a development in a new industrial area. The initial planning application was refused but subsequently granted on appeal. This led to knock-on effects as subsequent changes requested by the client required planning permission. The site […]
Read moreMotor Fuel Group
8 EV charging stations installed. Installed 3 new jet wash bays and equipment. CHALLENGE Before work had begun on the EV bay area, the site had been a typical verge area adjacent to a petrol filling station. It had poor vegetation and no landscaping between the site’s main entrance and exit. SOLUTION Wyeth, a Sevan […]
Read morePopeyes
Popeyes is undergoing a rebrand and is looking to refresh its restaurants across the U.S. They needed a partner who could help them create a new restaurant design prototype at their flagship site in Metairie, LA, and manage the remodel project lifecycle.
Read moreSkyline Scaffold
80 completed sites. 205 lease reviews. 250+ millwork installations CHALLENGE In 2021, Luxottica started remodeling North American stores for various brands including LensCrafters, Sunglass Hut, Ray Ban, Target Optical and Pearle Vision. The remodel includes complex millwork installation that follows very specific brand standards. Before beginning each project, all Luxottica locations go through a lease […]
Read moreSprouts
Sprouts identified 150 locations that required the removal of existing salad bars to install new prep meal cases.
Read moreSprouts
Sprouts encountered challenges in maintaining the freshness of their fruits, leading to losses in produce inventory.
Read moreSprouts
Sprouts sought assistance in removing existing produce refrigerated cases in 12 of its locations and replacing them with new ones.
Read moreSprouts
Sprouts needed project management expertise to remedy installation challenges across four Press Coffee vendors within their stores.
Read moreStarbucks
Starbucks operates thousands of stores across the U.S. and Canada which is a difficult and complex responsibility. New builds, site acquisitions and remodels all have unique challenges and require different approaches to complete the project.
Read moreStreamlined Production
Streamlined production of bill of materials. Improved client operations. CHALLENGE A retail client was relying heavily on multiple independent Microsoft Access databases to produce bills of materials. This caused challenges with data integrity, repetitive work and inconsistent communication and outputs. SOLUTION Sevan partnered with the client to deliver an innovative and consolidated solution that harmonized […]
Read more